New Zealand's earthquake zones 1 to 4 come from NZS 3604, the standard for timber-framed buildings. Zone 1 has the lowest earthquake risk and zone 4 the highest, and the zone sets how much bracing a house needs. Commercial buildings use a different measure, the hazard factor (Z), and the earthquake-prone building system sorts the country into high, medium and low seismic risk areas. This page explains all three and what they mean for gas isolation. For how they fit alongside NZS 4219, %NBS and Australia's AS 1170.4, see our plain-English overview of New Zealand seismic standards.
Earthquake zones 1 to 4 — what the numbers mean
The numbered zones most people search for come from NZS 3604:2011 (Timber-framed Buildings), the standard used for most New Zealand houses and other light timber-framed buildings. It divides the country into four earthquake zones, mapped in section 5 of the standard. Zone 1 has the lowest earthquake risk and zone 4 the highest.
The zone sets how much bracing a timber-framed building needs to resist earthquake loads. The higher the zone, the more bracing is required, and heavier roof and wall cladding increases it further. So "earthquake zone 2" simply means a site where NZS 3604 calls for more bracing than zone 1 but less than zones 3 and 4.
These zones apply only to buildings designed under NZS 3604. Commercial buildings, and anything else outside the scope of that standard, are designed using the Z factor in NZS 1170.5 instead. The NZS 3604 zone tells you nothing about gas isolation requirements.
To find the zone for a specific address, use the BRANZ Maps tool or ask your council. BRANZ's zones are adjusted to align with NZS 1170.5 and include the 2011 Canterbury boundary changes, so they may differ slightly from the printed map in NZS 3604.
The hazard factor (Z) — NZS 1170.5
For structural design, the governing standard is NZS 1170.5:2004 (Structural Design Actions — Earthquake Actions). Rather than dividing the country into zones, it gives each location a hazard factor, Z, which reflects the expected intensity of ground shaking. The higher the Z, the stronger the design earthquake loads. Auckland sits at the low end, with a Z of 0.13.
The highest hazard regions include Wellington, Marlborough, Hawke's Bay and the central South Island. These areas are close to major fault systems, including the Wellington Fault, the Alpine Fault and the Hikurangi subduction zone.
Canterbury is worth noting separately. Before 2010, Christchurch's Z of 0.22 placed it in the middle of the national range. The 2010–11 earthquake sequence showed that local ground motion can far exceed what the hazard factor suggests, through soil amplification and previously unknown faults. In May 2011, an urgent amendment to the Building Code compliance document B1 raised the Z for Christchurch, Selwyn and Waimakariri from 0.22 to 0.30. For building owners, the lesson is that Z is a design minimum, not a ceiling on what can happen.
Seismic risk areas — high, medium and low
The earthquake-prone building (EPB) system uses the Z factor to sort the country into three seismic risk areas:
- High seismic risk — Z of 0.3 or more
- Medium seismic risk — Z of 0.15 up to (but not including) 0.3
- Low seismic risk — Z below 0.15
The Building (Earthquake-prone Buildings) Amendment Act, passed in September 2026, has changed this picture. The changes to seismic zones are already in force. Auckland, the Chatham Islands and the upper North Island low seismic zone are now outside the EPB system, and existing EPB designations there have been removed. Parts of coastal Otago, including Dunedin, and Stewart Island have moved from low to medium, so for those areas the Z bands above are no longer the whole story.
The rest of the reform applies from 1 July 2027. From then, only two types of building can be earthquake-prone, and both must be in a medium or high seismic area: unreinforced masonry buildings, and concrete or other heavy buildings of three or more storeys. Until then, the current rules still apply outside the areas already removed. Check current MBIE guidance before relying on any EPB timeframe.
EPB rules cover a building's structure, not its gas services, although strengthening work is a natural time to review gas isolation. If you want to weigh hazard against your building's vulnerability and what's inside it, see our guide to seismic risk assessment in NZ.
Hazard estimates are changing
The 2022 update to the National Seismic Hazard Model raised estimated shaking for most of the country. GNS Science reports increases of 50 percent or more on average compared with previous modelling. A new technical specification, TS 1170.5:2025, is the first major update to NZS 1170.5 since 2004. It is currently voluntary and is not yet the basis for assessing existing buildings. If you're designing or upgrading a building, ask your engineer which version applies.
Hazard zone versus Importance Level — what actually drives requirements
A common misconception is that a building's hazard zone determines what's required for its gas systems. In practice, the building's Importance Level (IL) matters as much as the zone. Importance Levels are set by Building Code clause A3 and AS/NZS 1170.0, based on the consequences if the building fails:
- IL 1 — buildings posing low risk to human life or the environment, or a low economic cost, if they fail
- IL 2 — buildings posing normal risk, which covers most commercial and residential buildings
- IL 3 — buildings of higher societal benefit or importance, or with higher risk factors for occupants, such as large assembly buildings and schools
- IL 4 — buildings essential to post-disaster recovery or associated with hazardous facilities, such as hospitals and emergency services
NZS 4219 (Seismic Performance of Engineering Systems in Buildings) then applies the building's IL to set seismic performance requirements for services, including gas pipework. Higher IL buildings face stricter seismic performance requirements for their services, which makes automatic gas isolation worth specifying. Whether it's required for a specific building depends on the consent and the engineer's design. (See our overview of NZ earthquake safety requirements for commercial buildings.) The framework is the same across the country, but design actions still scale with Z, so an IL 4 hospital in Wellington is designed for stronger shaking than one in Auckland.
A fifth level, IL 5, covers special structures whose failure would be catastrophic, such as major dams. These are designed case by case.
What this means for building owners
For IL 2 buildings, which make up the majority of commercial stock, automatic gas isolation may not be a code requirement. The risk calculation is still straightforward. If a moderate earthquake damages gas pipework and supply isn't automatically isolated, gas keeps flowing until someone shuts it off by hand. In a building that has just been evacuated, that may take minutes. (Do you need an earthquake gas shutoff?) The consequence is the same whether the building is in Wellington or Auckland.
For IL 3 and IL 4 buildings, resolve the gas isolation question at consent stage, not after an event.
Matching sensitivity to location and application
The Solid State Seismic Shutoff — MK6 has five sensitivity settings, adjustable in the field via DIL switch: 0.012g, 0.025g, 0.050g, 0.100g and 0.200g. These figures are specific to the MK6, not a general industry range.
The right setting depends on the location, the application and which failure would cost more: a nuisance shutdown or an undetected gas leak. A low setting suits sites where an undetected leak is the bigger risk, such as buildings with large occupant numbers or critical infrastructure. A higher threshold suits an industrial facility in a lower-hazard region where an unnecessary shutdown is operationally costly. Because the setting is field-adjustable, the threshold can be reviewed as the building's use changes. Power supply differs by installation too. Mains-powered buildings use the AC variant with battery backup, while substations and remote sites use the DC no-break variant. See the MK6 variants and specifications.
Finding out what applies to your building
Your building's Importance Level should be documented in the building consent. For older buildings where consent documentation is incomplete or hard to get, a structural or building services engineer can confirm the IL. You can also ask your council or check MBIE guidance on building classifications. If seismic gas isolation is required, or you want to add it as a precaution, we can advise on the right specification for your location and application.