What are the earthquake safety requirements for commercial buildings in New Zealand? Owners face three layers of obligation: the earthquake-prone building (EPB) system for the structure, NZS 4219 for the services inside it, and gas safety law for the gas installation. The EPB system is mid-reform, so the rules a commercial building owner works to today are not the rules that will apply from July 2027. This page sets out both, and where gas isolation fits.
The earthquake-prone building system today
The Building Act 2004, as amended in 2016, set up a national system for identifying and managing earthquake-prone buildings. Territorial authorities identify potentially earthquake-prone buildings, and owners must supply an engineering assessment. A building rated below 34%NBS can be classed as earthquake-prone. The council then issues an EPB notice, the building must display it, and the owner has a set period to strengthen or demolish. That period depends on the building's seismic risk area and whether it is a priority building. A 2024 amendment gave owners an extra four years on existing deadlines.
What the 2026 reform changes
In September 2026, Parliament passed the Building (Earthquake-prone Buildings) Amendment Bill. It changes the system in two steps:
- Now: buildings in Auckland, the Chatham Islands and the upper North Island low seismic zone are no longer earthquake-prone, and cannot be designated in future. Around 2,900 buildings nationally are expected to leave the register.
- From 1 July 2027: a building can only be earthquake-prone if it is in a medium or high seismic area and is either unreinforced masonry, or made of heavy materials and three or more storeys. %NBS stops being the legal test. Remediation requirements will depend on each building's risk profile, under a new methodology MBIE is preparing.
Until 1 July 2027, the current rules still apply outside the areas already removed. MBIE is due to release guidance ahead of commencement. Check current MBIE guidance before relying on any EPB deadline. For how seismic areas are defined, see NZ earthquake zones explained.
%NBS after the reform
%NBS — percentage of New Building Standard — compares a building's expected seismic performance with what the Building Code requires of a new building on the same site. It is assessed by a chartered engineer, first through an initial seismic assessment (ISA) and, where needed, a detailed seismic assessment (DSA).
The reform removes %NBS from the legal EPB test, but not from commercial property. Leases, lending, insurance and due diligence still commonly refer to %NBS, with 67%NBS a common benchmark for tenants and buyers. Corporate and government tenants often have their own minimum ratings. Leases with seismic clauses may need review as the new system beds in. Our overview of New Zealand seismic standards covers %NBS in more detail.
Building services: NZS 4219
Structural rules cover the frame, not what runs through it. NZS 4219:2009 covers seismic restraint of non-structural building services — pipework, ducting and plant, including gas pipework. It is referenced by AS/NZS 5601.1:2022, the gas installations standard. A building can meet its structural target and still lose services that weren't restrained to move with it.
Gas safety and secondary risk
Restraint reduces the chance of a gas pipe failing. It doesn't remove it. Pipes can still break at joints, building entry points and fittings under strong shaking, and escaping gas after an earthquake is a known cause of post-earthquake fire.
The Gas (Safety and Measurement) Regulations 2010, administered by WorkSafe New Zealand, require gas installations to be safe. In New Zealand, an earthquake is a foreseeable event. Automatic seismic isolation at the building's gas entry point is one way owners and facilities managers address that risk, and it is a control insurers can recognise.
What commercial building owners should do now
- Check your EPB status: if you hold an EPB notice, find out whether your building leaves the system now or after 1 July 2027.
- Keep your seismic assessment current: %NBS still matters for leases, finance and insurance.
- Review building services: confirm gas pipework and plant are restrained to NZS 4219.
- Address secondary gas hazard: consider automatic gas isolation, often prompted by a seismic risk assessment.
Structural rules say what the building must withstand. They don't stop a broken gas line from feeding a fire. The Solid State Seismic Shutoff — MK6 is an electronic trigger that detects an earthquake and automatically isolates the gas supply. NZ-made since 1971. Contact us to discuss requirements for your building.